Block Paving Driveways & PatiosBuilt to Marshalls Standards
Marshalls, Brett, Bradstone and Tobermore block paving installed on a properly engineered sub-base, laid in the pattern you want, joint-swept and sealed to stay tight. Free written quote in 24–48 hours, backed by a 10-year workmanship guarantee.
Rated 4.8★ on Google · £1M insured · Up to 10-year workmanship guarantee

Everything you need to know before you commit
Block paving is a modular hard surface built from small clay or concrete blocks laid onto a compacted sub-base and bedding layer, then jointed with kiln-dried sand. Done properly, it delivers a timeless, individually replaceable surface that suits period cottages and new-builds alike.
Homeowners who want a classic finish with pattern options, colour options and the practical benefit that damaged blocks can be swapped out individually rather than resurfacing the whole drive. Ideal for driveways, footpaths, patios, courtyards and commercial frontages across Hampshire.
When your existing drive is unbonded gravel, cracked concrete or worn tarmac and you want a decorative permanent finish. Also the right answer where you want defined edging, patterned borders or a design that mixes multiple block sizes.
Block paving that sinks, spreads or grows weeds is almost always a base problem, not a block problem. A quality Marshalls block will last decades, but only if it's laid on a compacted MOT Type 1 sub-base, screeded bedding sand, and concreted edge restraints. That's non-negotiable for us.
What happens if you delay, or hire the wrong crew
Block paving failures are rarely dramatic, they're a slow, expensive erosion. A dip forms, water pools, blocks rock, edges spread, weeds root, and by year three you're pressure-washing every weekend and considering a full rebuild.
Risks of putting it off
- Blocks sinking in the wheel tracks where the sub-base was skimped
- Edge blocks kicking out because restraints weren't concreted properly
- Weed growth through failing joints when kiln-dried sand isn't topped up
- Standing water and ice where the drive falls the wrong way
- Discolouration from oil and tyre marks that were never sealed against
Common mistakes homeowners make
- Choosing a fitter based on Facebook photos alone with no base-build detail
- Skipping the sealer to save £300 and paying £3,000 for cleaning later
- Believing the sub-base can be 'the existing driveway' without excavation
- Picking the cheapest block colour blend without seeing a real sample
- Not asking who handles the drainage, planning permission still applies over 5m²
Owner-led, from first visit to final sweep
- 01
Site visit and design consultation
Charlie visits, measures, and walks you through pattern options, herringbone, stretcher bond, basket-weave, plus colour ranges from Marshalls, Brett, Bradstone and Tobermore.
- 02
Written fixed quote in 24–48 hours
You get a detailed quote covering block choice, pattern, sub-base spec, edging, drainage and cleanup, no hidden extras once we start.
- 03
Excavation and sub-base
We excavate to the correct depth, remove all spoil, and lay a compacted MOT Type 1 sub-base, 150mm minimum for driveways, more where the ground demands it.
- 04
Bedding, laying and cutting
A screeded sharp sand bedding layer is laid, then the blocks are placed in your chosen pattern with cuts made cleanly to your borders and manhole covers.
- 05
Edge restraints and compaction
Perimeter blocks are haunched in concrete so nothing walks. The finished surface is plate-compacted, joints swept with kiln-dried sand, then re-compacted to lock everything solid.
- 06
Optional seal and sign-off
For an additional cost we can apply a joint-stabilising sealer to stop weeds, resist oil and enhance colour. Then we walk the drive with you and issue your written guarantee.
The measurable benefits you get
Individually replaceable
Damaged blocks can be lifted and swapped one-by-one, you'll never have to resurface the whole drive because of one oil stain or a cracked corner.
Marshalls & Brett quality
We install premium ranges installed to industry standards, backed by our up to 10-year workmanship guarantee.
Pattern and colour flexibility
Herringbone, stretcher bond, basket-weave, plus multi-block borders, contrast edging and rumbled 'aged' finishes for period homes.
Genuinely long-lived
A properly built block paved drive routinely lasts 20+ years. The sub-base is what buys you those years, and that's what we spend our time on.
Cleanable and re-sealable
Blocks respond well to jet-washing, re-sanding and re-sealing every 3–5 years, a small maintenance investment for decades of finish.
SUDS-friendly options
Permeable block paving ranges are available where drainage or planning demands it, installed with the correct open-graded aggregate base.
Materials, methods and specification
The block is the smallest part of the job. Get the base, edges and jointing wrong and even a Marshalls block will fail. Here's how we build block paving to last.
Block ranges we install
Marshalls Drivesys, Tegula, Argent and Standard concrete; Brett Alpha, Omega and Beta ranges; Bradstone Woburn and Monksbridge; Tobermore Historic and Sienna. We help you pick the range that suits the property age and budget, not the one with the best rep visit.
Pattern choice
45° herringbone is the strongest bond and best for driveways under vehicle load. 90° herringbone reads more contemporary. Stretcher bond suits paths and patios. Basket-weave sits well against period cottages. We show you real photos of Hampshire jobs, not stock renders.
Sub-base and bedding
150mm compacted MOT Type 1 minimum, with a 30–40mm screeded sharp sand bedding layer. Over made ground or clay, we increase depth and may specify a geotextile membrane to prevent migration.
Edge restraints and drainage
All perimeter blocks are haunched in concrete on both sides, the single most-skipped step by cheap fitters. Falls are set to gullies, linear drains, soakaways or permeable stone strips as the site demands.
Jointing and sealing
Joints are swept with kiln-dried sand and re-compacted. We recommend sealing with a joint-stabilising sealer after 8–12 weeks of use, it locks the sand, resists oil and enhances colour.
Residential vs commercial
Commercial block paving uses a thicker paving unit, deeper sub-base and often a bound-jointing system to handle heavier traffic. Same standards apply, just designed to the loading.
Real Hampshire projects, real finishes






Answers to the questions we hear most
Related services
Permeable, SUDS-compliant resin-bound driveways with a smooth, low-maintenance finish.
Natural stone, porcelain, sandstone and concrete slab patios built to last.
Retaining walls, sleeper builds, garden walls and brick features.
Get a fixed, no-pressure quote for your Hampshire project, in 24–48 hours.
Free site visit. Owner-led from day one. Written quotes with no gimmicks and no chasing.

